The Rhino PD-200 is the heaviest handheld pneumatic driver Rhino builds — a 170 lb class post and pile driver whose 4 in. alloy steel piston delivers approximately 900 BPM at 100 PSI, out-hitting a 90 lb jackhammer for blow energy on dock pile, sheet pile, and large wood post work. It's the tool for jobs that outgrow every smaller driver but don't justify a truck-mounted rig.
Five master chucks, selectable right on this page, make one PD-200 a whole pile-driving fleet: 4×6 (the PD-200G guard rail configuration) for 4×6 H-column guardrail posts, 6×6 for wood piling, 5-1/2 in. and 7 in. round for 4-3/4 to 6 in. pipe and dock pile, and slotted (the PD-200S) for sheet pile and seawall systems. A chuck swap moves the same driver from a highway guardrail repair to a boat dock job to a seawall — no second tool required.
- Rhino's heaviest handheld pneumatic post and pile driver — 170 to 177 lb depending on configuration
- Five selectable master chucks: 4×6 guard rail, 6×6 wood piling, 5-1/2 in. round, 7 in. round, and slotted sheet pile
- Heavy-duty single-piston design with one moving part — exceptionally durable and low maintenance
- 4 in. alloy steel piston delivers approximately 900 BPM at 100 PSI
- Outperforms a 90 lb jackhammer for blow energy on dock pile, sheet pile, and large wood post work
- 72 CFM at 100 PSI air consumption — requires a 100+ CFM tow-behind or trailer-mounted compressor
Required Air-Line Setup
A tool this size only earns its keep on properly conditioned air. Before the first post goes in, the line needs a throttle valve for control at the operator's position, a filter-regulator-lubricator (FRL) to knock out moisture and regulate pressure, and rock drill oil flowing through the lubricator whenever the tool is hitting. The PD-200 Economy Kits — 5-1/2 in. chuck or 7 in. chuck — put the driver and all of that required plumbing on one PO.
PD-200 FAQ
Can the PD-200 drive guardrail posts?
Yes — select the 4×6 master chuck (the PD-200G configuration) and it drives 4×6 H-column guardrail posts directly, no truck-mounted rig required. That makes it the repair-and-short-run tool for highway and DOT crews; for truck- and machine-mounted guardrail driving, see our mounted post drivers.
What about piles, pipe, and sheet pile?
That's the rest of the five-chuck system. The 5-1/2 and 7 in. round chucks cover 4-3/4 to 6 in. pipe and dock pile (the PD-200 pile driving kit bundles that setup), the 6×6 chuck drives wood piling, and the slotted PD-200S chuck runs sheet pile and seawall systems.
What air supply does it take?
72 CFM at 100 PSI, so plan on a 100+ CFM tow-behind or trailer-mounted compressor — the FRL spec sheet in the documents below covers the rest of the air-line setup.
Is there a lighter option?
The 138 lb PD-140 also offers 4×6 and slotted chucks, at less weight and less blow energy per hit. The Rhino pneumatic lineup page puts all four air drivers side by side, and the Find My Driver tool in the buyer's guide will point you to the right one.






















